Post-construction slit work "Non-Pick Method" Construction Photo Collection Giveaway!
[Construction Photo Collection Giveaway] Equivalent seismic reinforcement effect to complete slits! Introducing construction examples in condominiums.
The "Non-Pick Method" is a post-construction slitting process that allows for continuous and consistent construction from end drilling to groove cutting with a dedicated cutting machine (equipped with a special bit) in a single setup. It is a groundbreaking method that requires no chipping, produces low vibration and low noise, and generates minimal waste with excellent precision. This photo collection of the construction showcases examples of the "Non-Pick Method" used in a certain apartment building in Tokyo. It can be utilized as a partial slitting method that allows construction to be carried out while residents are living in the building, achieving seismic effects equivalent to those of complete slitting. We encourage you to take a look at this opportunity. 【Main Features】 ■ Continuous and consistent cutting can be achieved with a single setup of the dedicated cutting machine ■ The precision and finish of the slits are outstanding ■ Dust-free construction with low vibration and low noise, requiring no chipping ■ Drilling and cutting debris is in a slurry form (liquid mixed with sand particles), making disposal easy For more details, please contact us or download the catalog.
- Company:ロンビックジャパン
- Price:Other